Recent Projects 2017-07-24T10:11:03+00:00

Recent Projects

Take a look at some of the projects recently completed by AGM Group

  • Barclays Bank Delapidations

    Emaintain were asked to attend Barclays branch in Ayr to carry out refurbishment works to the external areas and internal offices of the branch. These works were completed in the evenings over a two week period while maintaining full operation and access of the offices for the branch staff. […]

  • MBNL Access

    With the MBNL phone mast in Johnshaven Aberdeenshire went down and MBNL engineers could not access the mast to carry out repairs eMaintain were called to attend urgently to clear 200m of access road to allow engineer to carry out repairs. A team was deployed with the necessary machinery and cutting tools and cleared the [...] […]

  • RBS Inverness

    Following years of occasional water ingress from the flat roof above the safe within Royal Bank of Scotland Inverness High Street branch eMaintain were requested to find a solution to this ongoing problem. This posed significant issues due to AC cages and steel staircases and fencing fitted on the flat roof. The steelwork was carefully [...] […]

  • RBS Airdrie

    Due to an upcoming festival within Airdrie town centre eMaintain were requested to carry out some refurbishment works to the RBS within the square at Graham Street in Airdrie. Scaffold was erected to the full perimeter of the building, which allowed for gutter replacements, replacement of bird deterrent measures, chimney repairs and decoration to all [...] […]

  • Parklands Roof

    Parklands Roof After several years of repeated ingress issues at various locations throughout the building eMaintain were requested to replace the roof coverings to the four dormers on the roof at the property. Liaising closely with Thomasons Surveyors and Marley representatives we successfully removed the defective concrete roof tiles, underlay and timber battens and replaced [...] […]

  • Cosentino

    Cosentino Group is a global, Spanish, family-owned company that produces and distributes high value innovative surfaces for the world of design and architecture. AGM Interiors carried out the complete refurbishment of the new Consetino Centre at Livingstone including shop fit, mechanical and electrical, heating and ventilation. The Cosentino Centre concept offers an excellent, high quality service, [...] The post Cosentino appeared first on AGM Interiors. […]

  • Queens Park Tennis Club

    Keeping an eye open for reusables from site it not always easy. With projects turning around so quickly it is hard to repurpose them in time. In this example, we used the gumtree forum to offer a modular veneer reception desk to the market. This resulted in many enquiries for local business to second hand [...] The post Queens Park Tennis Club appeared first on AGM Interiors. […]

  • Jd Sports

    AGM Group completed the new store fit out of JD Sports.  A complex tight timescale project requiring diligent planning and execution. The post Jd Sports appeared first on AGM Interiors. […]

  • Max Mara

    High quality watches require a high quality store.  AGM were on hand to provide a secure and professional fit out in keeping with the high quality brands on display. The post Max Mara appeared first on AGM Interiors. […]

  • The Watch Collection Edinburgh Airport

    High quality watches require a high quality store.  AGM were on hand to provide a secure and professional fit out to match the high quality brands on display. The post The Watch Collection Edinburgh Airport appeared first on AGM Interiors. […]

  • Superdrug Partick

    AGM Building Services recently completed a full mechanical and electrical fit out at the Superdrug store in Partick Glasgow. Works included strip out of the redundant systems and installation of a brand new hitachi air conditioning system as well as a ventilation system for the main floor and toilets. Working alongside AGM Interiors who carried [...] The post Superdrug Partick appeared first on AGM Building Services. […]

  • Intu Braehead – Low temperature hot water system (LTHW)

    AGM Building Services were awarded the contract to install new LTHW Flow and Return Pipework and Commercial Ductwork Systems to the new Internal shopping Units. The program of works began in Jan 2017 and completed within the contract program approx. 4 weeks. These works will involve AGM Building Services working alongside the centres Building Consultant, Operation Teams [...] The post Intu Braehead – Low temperature hot water system (LTHW) appeared first on AGM Building Services. […]

  • Intu Braehead – Ventilation Duct System

    AGM Building Services were appointed to install a large duct system to provide ventilation for two internal retail units. The system was sourced locally from Lindab Glasgow who boast a reputation for quality ductwork manufacture. Works were carried out overnight  to ensure minimal disruption to the operation of the shopping centre. The post Intu Braehead – Ventilation Duct System appeared first on AGM Building Services. […]

  • Northgate Building Glasgow

    AGM Building Services were appointed to undertake an m&e installation for the department of working pensions. This office refurbishment project involve the installation of air conditioning into new comms room and installation of condensers on the roof. With I.T being a central part to any modern office the priority was to ensure zero disruption to the [...] The post Northgate Building Glasgow appeared first on AGM Building Services. […]

  • Argowan Hospice Heating System Replacement

    AGM Building Services removed the redundant heating system at Ardgowan Hospice replacing it with a brand new system powered by Worcester Bosch GB162 boilers providing heating for 25 offices and a 10% reduction in energy costs. The post Argowan Hospice Heating System Replacement appeared first on AGM Building Services. […]